How a contracting authority describes what it is buying: the ways of formulating technical specifications, references to standards and equivalence, when a make or trade mark may be named, and the rules on labels, test reports, certificates and variants.

Updated 20 November 2026

Reviewed by Mara Ribeiro Duarte, Head of Public Sector at Closer · 20 November 2026

Legal basisRegulation 42(1) · Regulation 42(4) · Regulation 42(6) · Regulation 42(7) · Regulation 42(8) · Regulation 42(9) · Regulation 42(10) · Regulation 42(11) · Regulation 43(1) · Regulation 43(3) · Regulation 43(4) · Regulation 44(2) · Regulation 44(4) · Regulation 45(2) · Regulation 45(4) · official text

The technical specifications say what the contracting authority wants to buy, and so shape who can compete for it. Regulations 42 to 45 govern how they are written, the place of standards, the limits on naming a make or source, and three related tools: labels, test reports and certificates, and variants.

What the specifications are and where they sit

The technical specifications are set out in the procurement documents and lay down the required characteristics of the works, services or supplies (Regulation 42(1)). The definition of a technical specification in Regulation 2 differs for supply and service contracts and for works contracts, and covers matters such as quality, environmental and climate performance, accessibility, safety, testing and production methods (Regulation 2(1)).

The required characteristics may also refer to the specific process or method of production or provision, or to a specific process for another stage of the life cycle, even where those factors do not form part of the material substance of what is bought, provided they are linked to the subject matter of the contract and proportionate to its value and its objectives (Regulation 42(2)). The specifications may also say whether the transfer of intellectual property rights will be required (Regulation 42(3)).

Accessibility

For all procurement intended for use by natural persons, whether the general public or staff of the contracting authority, the technical specifications must, except in duly justified cases, be drawn up so as to take into account accessibility criteria for persons with disabilities or design for all users (Regulation 42(4)). Where mandatory accessibility requirements have been adopted by a legal act of the European Union, the specifications must be defined by reference to them as far as those criteria are concerned (Regulation 42(5)).

Equal access and competition

Technical specifications must afford equal access of economic operators to the procurement procedure and must not have the effect of creating unjustified obstacles to the opening up of public procurement to competition (Regulation 42(6)). This sits alongside the general principles: equal and non-discriminatory treatment, transparency and proportionality (Regulation 18(1)), and the rule that a procurement may not be designed with the intention of artificially narrowing competition (Regulation 18(2)).

The four ways of formulating a specification

Without prejudice to mandatory national technical rules compatible with European Union law, a specification must be formulated in one of four ways (Regulation 42(7)):

OptionHow the requirement is expressed
Performance or functional requirementsIn terms of performance or function, including environmental characteristics, where the parameters are precise enough for tenderers to determine the subject matter and for the authority to award the contract (Regulation 42(7)(a)).
Reference to standardsBy reference to technical specifications in a fixed order of preference, each reference accompanied by the words “or equivalent” (Regulation 42(7)(b)).
Performance, with standards as presumptionPerformance or functional requirements, with reference to standards as a means of presuming conformity with them (Regulation 42(7)(c)).
MixedStandards for certain characteristics and performance or functional requirements for others (Regulation 42(7)(d)).

Where the authority refers to standards, the order of preference is (Regulation 42(7)(b)):

  1. national standards transposing European standards (Regulation 42(7)(b)(i));
  2. European Technical Assessments (Regulation 42(7)(b)(ii));
  3. common technical specifications (Regulation 42(7)(b)(iii));
  4. international standards (Regulation 42(7)(b)(iv));
  5. other technical reference systems established by the European standardisation bodies (Regulation 42(7)(b)(v));
  6. when none of these exist, national standards, national technical approvals or national technical specifications relating to the design, calculation and execution of the works and use of the supplies (Regulation 42(7)(b)(vi)).

The terms standard, European standard, national standard and technical reference are defined in Regulation 2 (Regulation 2(1)).

Where the specifications cannot be established with sufficient precision by reference to such standards, a competitive procedure with negotiation or a competitive dialogue may be used (Regulation 26(3)(a)(iv)); see the guide on procedures.

Equivalence: the tenderer’s right to prove it

  • Specification by reference to standards. The authority must not reject a tender on the ground that what is offered does not comply with the referenced specifications, once the tenderer proves in its tender, by any appropriate means, including the means of proof in Regulation 44, that its solutions satisfy the requirements in an equivalent manner (Regulation 42(10)).
  • Specification by performance or function. The authority must not reject a tender that complies with a national standard transposing a European standard, a European technical approval, a common technical specification, an international standard or a technical reference system, where those specifications address the performance or functional requirements set (Regulation 42(11)). The tenderer must prove in its tender, by any appropriate means, that what complies with the standard meets those requirements (Regulation 42(12)).

In both cases the proof belongs in the tender. A rejected tenderer may ask in writing for the reasons, including those for a decision of non-equivalence, and must receive them within 15 days of the request (Regulation 55(2)(b)).

Makes, sources and trade marks

Unless justified by the subject matter of the contract, technical specifications must not refer to a specific make or source, a particular process characterising the products or services of a specific economic operator, trade marks, patents, types, or a specific origin or production, with the effect of favouring or eliminating certain undertakings or certain products (Regulation 42(8)).

Such a reference is permitted only on an exceptional basis, where a sufficiently precise and intelligible description of the subject matter under paragraph (7) is not possible, and it must then be accompanied by the words “or equivalent” (Regulation 42(9)).

Labels

A label is any document, certificate or attestation confirming that works, products, services, processes or procedures meet certain requirements, and the label requirements are what must be met to obtain it (Regulation 2(1)).

Where an authority intends to buy works, supplies or services with specific environmental, social or other characteristics, it may require a specific label as means of proof, in the technical specifications, the award criteria or the contract performance conditions (Regulation 43(1)), but only where all of these conditions are met:

  • the label requirements concern only criteria linked to the subject matter of the contract and appropriate to define its characteristics (Regulation 43(1)(a));
  • they are based on objectively verifiable and non-discriminatory criteria (Regulation 43(1)(b));
  • the label is established in an open and transparent procedure in which all relevant stakeholders may participate (Regulation 43(1)(c));
  • the label is accessible to all interested parties (Regulation 43(1)(d));
  • the label requirements are set by a third party over which the applicant for the label cannot exercise a decisive influence (Regulation 43(1)(e)).

If the authority does not require all of the label requirements to be met, it must indicate which ones it refers to (Regulation 43(2)). It must accept all labels that confirm equivalent label requirements (Regulation 43(3)). Where an economic operator demonstrably could not obtain the label, or an equivalent one, within the time limits for reasons not attributable to it, the authority must accept other appropriate means of proof, which may include a technical dossier of the manufacturer, where the operator proves that it fulfils the requirements (Regulation 43(4)).

Where a label meets the conditions in paragraph (1)(b) to (e) but also sets out requirements not linked to the subject matter, the authority may not require the label itself; it may instead define the specification by reference to those detailed specifications of the label, or parts of it, that are linked to the subject matter and appropriate to define it (Regulation 43(5)).

Test reports and certificates

An authority may require a test report or certificate from a conformity assessment body as proof of conformity with the technical specifications, the award criteria or the contract performance conditions (Regulation 44(2)). A conformity assessment body is one accredited in accordance with Regulation (EC) No 765/2008 (Regulation 44(1)).

Where the authority asks for certificates from a specific body, it must also accept certificates from equivalent other bodies (Regulation 44(3)). It must accept other appropriate means of proof, including a technical dossier of the manufacturer, where the operator had no access to the certificates or test reports, or no possibility of obtaining them in time, for reasons not attributable to it, and where it proves by those means that the requirements or criteria are met (Regulation 44(4)).

Variants

The authority may authorise or require tenderers to submit variants (Regulation 45(1)(a)), on these terms:

  1. It must say in the contract notice, or in the invitation to confirm interest where a prior information notice is the call for competition, whether it authorises or requires variants (Regulation 45(2)); “admission or prohibition of variants” is one of the items of a contract notice (Schedule 3).
  2. Without that indication variants are not authorised, and variants must be linked to the subject matter of the contract (Regulation 45(3)).
  3. The procurement documents must state the minimum requirements for variants, any requirements for their presentation, and in particular whether a variant may be submitted only together with a tender that is not a variant (Regulation 45(4)).
  4. Only variants meeting those minimum requirements are taken into consideration (Regulation 45(1)(b)).
  5. The award criteria chosen must work for both variants and conforming tenders that are not variants (Regulation 45(5)).

In supply and service procedures, an authority that has authorised or required variants must not reject a variant on the sole ground that, if successful, it would lead to a service contract rather than a supply contract, or the reverse (Regulation 45(6)).

Want your tender documents checked before publication? We will show you how Procurelex Check does it.

Request a demo