Technical specifications

Where the technical specifications are set out, how they may be formulated, when a make, a source or a trade mark may be named, and the rules on equivalence, labels, certificates and variants.

Updated 20 November 20269 questions

Reviewed by Mara Ribeiro Duarte, Head of Public Sector at Closer · 20 November 2026

These answers are on S.I. No. 284 of 2016, as amended by S.I. No. 203 of 2017.

Where are the technical specifications set out?

In the procurement documents. They lay down the required characteristics of the works, services or supplies (Regulation 42(1)). A procurement document is any document produced or referred to by a contracting authority to describe or determine elements of the procurement or the procedure (Regulation 2(1)).

Legal basisRegulation 42(1) · Regulation 2(1) · official text

How may a specification be formulated?

In one of four ways: in terms of performance or functional requirements; by reference to standards and other technical specifications in a set order of preference; by performance requirements with standards as a means of presuming conformity; or by a mix of the two (Regulation 42(7)). The guide on technical specifications sets out the order of preference.

Legal basisRegulation 42(7) · official text

Must a reference to a standard say “or equivalent”?

Yes. Where a specification refers to standards and the other technical specifications in the order of preference, each reference must be accompanied by the words “or equivalent” (Regulation 42(7)(b)).

Legal basisRegulation 42(7)(b) · official text

Can a tender be rejected because it does not meet the standard referred to?

Not if the tenderer proves in its tender, by any appropriate means, that its solution satisfies the requirements in an equivalent manner (Regulation 42(10)). Likewise, where the specification is written in performance terms, a tender complying with a relevant standard that addresses those requirements may not be rejected (Regulation 42(11)); the tenderer must prove that it meets them (Regulation 42(12)).

Legal basisRegulation 42(10) · Regulation 42(11) · Regulation 42(12) · official text

May a specification name a make or a source?

Unless justified by the subject matter of the contract, technical specifications shall not refer to a specific make or source, a particular process, trade marks, patents, types, or a specific origin or production, with the effect of favouring or eliminating certain undertakings or products (Regulation 42(8)). Such a reference is permitted only exceptionally, where a sufficiently precise and intelligible description is not possible, and then with the words “or equivalent” (Regulation 42(9)).

Legal basisRegulation 42(8) · Regulation 42(9) · official text

Must the specifications take accessibility into account?

For all procurement intended for use by natural persons, whether the general public or staff, the specifications must, except in duly justified cases, take into account accessibility criteria for persons with disabilities or design for all users (Regulation 42(4)). Where EU law adopts mandatory accessibility requirements, the specifications are defined by reference to them (Regulation 42(5)).

Legal basisRegulation 42(4) · Regulation 42(5) · official text

May an authority require a specific label?

Yes, as proof of specific environmental, social or other characteristics, where the label requirements are linked to the subject matter, objectively verifiable and non-discriminatory, and set by a third party the applicant cannot decisively influence, and where the label is established in an open and transparent procedure and accessible to all (Regulation 43(1)). It must accept equivalent labels (Regulation 43(3)), and other appropriate means of proof where an operator could not obtain the label in time for reasons not attributable to it (Regulation 43(4)).

Legal basisRegulation 43(1) · Regulation 43(3) · Regulation 43(4) · official text

May an authority require a test report or certificate?

Yes, from a conformity assessment body, as proof of conformity with the technical specifications, the award criteria or the contract performance conditions (Regulation 44(2)). Certificates from equivalent bodies must also be accepted (Regulation 44(3)), and other appropriate means of proof, such as a technical dossier of the manufacturer, where the operator had no access to them for reasons not attributable to it (Regulation 44(4)).

Legal basisRegulation 44(2) · Regulation 44(3) · Regulation 44(4) · official text

May tenderers submit variants?

Only if the authority authorises or requires them, and says so in the contract notice or the invitation to confirm interest (Regulation 45(2), Regulation 45(3)). The procurement documents must state the minimum requirements for variants, and only variants meeting them are considered (Regulation 45(4), Regulation 45(1)(b)).

Legal basisRegulation 45(2) · Regulation 45(3) · Regulation 45(4) · Regulation 45(1)(b) · official text