Defined in Regulation 2. Text in operation from 18 April 2016, as amended by the instruments the Irish Statute Book’s Legislation Directory lists. Where this page and the official publication differ, the official publication prevails: official text

“accelerated procedure” means—

(a) an open procedure in which the contracting authority has exercised the power conferred by Regulation 27(3) to fix a time limit for the receipt of tenders that is shorter than the minimum specified in Regulation 27(1)(b),

(b) a restricted procedure in which the contracting authority has exercised the power conferred by Regulation 28(5) to fix a time limit—

(i) for the receipt of requests to participate that is shorter than the minimum specified in Regulation 28(1)(b); or

(ii) for the receipt of tenders that is shorter than the minimum specified in Regulation 28(1)(e), or

(c) a competitive procedure with negotiation in which the contracting authority has exercised the power conferred by Regulation 28(5) to fix a time limit—

(i) for the receipt of requests to participate that is shorter than the minimum specified in Regulation 29(4), or

(ii) for the receipt of initial tenders that is shorter than the minimum specified in Regulation 29(5);