How contracts for social and other specific services are advertised and awarded under the lighter rules of Regulations 74 to 77, which contracts may be reserved, and how design contests are run.

Part 3 of the Regulations contains two particular regimes. Chapter 1 (Regulations 74 to 77) sets lighter rules for public contracts for social and other specific services, referred to here as the light-touch regime: the contracting authority advertises and reports the contract, but designs its own procedure within the principles of transparency and equal treatment. Chapter 2 (Regulations 78 to 82) governs design contests. This guide covers both, the first in more detail.

## Which contracts

Chapter 1 applies to public contracts for the social and other specific services listed in Annex XIV to the Public Authorities Contracts Directive, where the value of the contract is equal to or greater than the threshold in Regulation 5(e) ([Regulation 74](https://procurelex.ie/regulations/74), [Regulation 5(e)](https://procurelex.ie/regulations/5#pe)). The Regulations do not reproduce the list of services; it must be read in Annex XIV to Directive 2014/24/EU, which is what the Regulations mean by the Public Authorities Contracts Directive ([Regulation 2(1)](https://procurelex.ie/regulations/2#p1)). The threshold for these services is higher than for other service contracts; see the [thresholds](https://procurelex.ie/thresholds) for the amount as made and as revised.

The value is estimated under the general rules of Regulation 6, net of VAT and including options and renewals explicitly specified in the procurement documents ([Regulation 6(1)](https://procurelex.ie/regulations/6#p1)). Below the threshold the regime does not apply ([Regulation 74](https://procurelex.ie/regulations/74)).

## Advertising the contract

A contracting authority that intends to award such a contract makes its intention known in one of two ways ([Regulation 75(1)](https://procurelex.ie/regulations/75#p1)):

| Means                    | Requirements                                                                                                                                                                                                                                                                                                                                                                                                       |
| ------------------------ | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ |
| Contract notice          | Contains the information in Part 8 of [Schedule 3](https://procurelex.ie/regulations/schedule-3), in the standard forms referred to in Regulation 51 ([Regulation 75(1)(a)](https://procurelex.ie/regulations/75#p1-a))                                                                                                                                                                                                                                                                                              |
| Prior information notice | Published continuously; contains the information set out in “Part 1 to 9 of Schedule 3”, as the text puts it (the Directive refers to Annex V Part I, which is Part 9 of Schedule 3); refers specifically to the types of services to be contracted; and states that the contract will be awarded without further publication, inviting interested operators to express their interest in writing ([Regulation 75(1)(b)](https://procurelex.ie/regulations/75#p1-b)) |

Neither is required where a negotiated procedure without prior publication could have been used under Regulation 32 for the award of a public service contract ([Regulation 75(2)](https://procurelex.ie/regulations/75#p2)). The grounds are those of [Regulation 32](https://procurelex.ie/regulations/32); see the guide on the [negotiated procedure without prior publication](https://procurelex.ie/guides/negotiated-procedure-without-publication).

After award, the contracting authority publishes a contract award notice with the information in Part 10 of Schedule 3 ([Regulation 75(3)](https://procurelex.ie/regulations/75#p3)). Award notices may be grouped on a quarterly basis and sent no later than 30 days after the end of the quarter ([Regulation 75(4)](https://procurelex.ie/regulations/75#p4)). All these notices are sent for publication under Regulation 51 ([Regulation 75(5)](https://procurelex.ie/regulations/75#p5)).

## Designing the procedure

The contracting authority determines the procedure to apply and may take account of the specificities of the services ([Regulation 76(1)](https://procurelex.ie/regulations/76#p1)). The procedure must be at least sufficient to ensure compliance with the principles of transparency and equal treatment of economic operators ([Regulation 76(2)](https://procurelex.ie/regulations/76#p2)). It may correspond to procedures, techniques or other features found elsewhere in the Regulations ([Regulation 76(7)](https://procurelex.ie/regulations/76#p7)), so an authority may borrow, for example, the structure of a restricted procedure or a framework agreement, but it is not bound to follow one.

Once a notice has been published, the authority must conduct the procurement and award the contract in conformity with what the notice says, including the conditions for participation, the time limits for contacting the authority and the award procedure ([Regulation 76(3)](https://procurelex.ie/regulations/76#p3)). The notice therefore fixes the rules: a change of procedure after publication is a departure from the notice.

### Exclusion

When awarding contracts under this Chapter, contracting authorities apply Regulation 57 in relation to the exclusion of candidates and tenderers, in the procedures they determine under paragraph (1) ([Regulation 76(4)](https://procurelex.ie/regulations/76#p4)). Paragraph (4) is read here as amended by S.I. No. 203 of 2017, which deleted the words “and selection”. The exclusion grounds of Regulation 57, mandatory and discretionary, therefore apply to these contracts as to any other; see the guide on [exclusion grounds](https://procurelex.ie/guides/exclusion-grounds). Paragraph (4) no longer names selection, and Regulation 76 does not itself apply Regulation 58: the authority conducts the procurement in conformity with the information in its notice ([Regulation 76(3)](https://procurelex.ie/regulations/76#p3)), by procedures at least sufficient to ensure transparency and equal treatment ([Regulation 76(2)](https://procurelex.ie/regulations/76#p2)).

### Award considerations

The authority may take into account any relevant considerations, including ([Regulation 76(5)](https://procurelex.ie/regulations/76#p5)):

- the need to ensure quality, continuity, accessibility, affordability, availability and comprehensiveness of the services;
- the specific needs of different categories of users, including disadvantaged and vulnerable groups;
- the involvement and empowerment of users;
- innovation.

### Time limits

The Regulations set no minimum number of days. All time limits imposed on economic operators, for responding to a contract notice or for any other step, must be reasonable and proportionate ([Regulation 76(6)](https://procurelex.ie/regulations/76#p6)).

## Reserved contracts for certain services

A contracting authority may reserve the right to participate to organisations, for certain health, social and cultural services covered by the CPV codes listed in that paragraph, eighteen entries that include the range 85000000-9 to 85323000-9 ([Regulation 77(1)](https://procurelex.ie/regulations/77#p1)). The organisation must meet all of these conditions ([Regulation 77(2)](https://procurelex.ie/regulations/77#p2)):

1. its objective is the pursuit of a public service mission linked to the delivery of those services ([Regulation 77(2)(a)](https://procurelex.ie/regulations/77#p2-a));
2. its profits are reinvested to achieve that objective, and any distribution of profits should be based on participatory considerations ([Regulation 77(2)(b)](https://procurelex.ie/regulations/77#p2-b));
3. its structures of management or ownership are based on employee ownership or participatory principles, or require the active participation of employees, users or stakeholders ([Regulation 77(2)(c)](https://procurelex.ie/regulations/77#p2-c));
4. it has not been awarded a contract for the services concerned by the same contracting authority under this Regulation within the preceding 3 years ([Regulation 77(2)(d)](https://procurelex.ie/regulations/77#p2-d)).

A reserved contract may not last longer than 3 years ([Regulation 77(3)](https://procurelex.ie/regulations/77#p3)), and the call for competition must refer to Regulation 77 ([Regulation 77(4)](https://procurelex.ie/regulations/77#p4)).

## After award

Contracts awarded under Regulation 74 may be modified during their term only as Regulation 72 allows ([Regulation 72(1)](https://procurelex.ie/regulations/72#p1)); see the guide on [contract performance and modification](https://procurelex.ie/guides/contract-performance-and-modification).

## Design contests

A [design contest](https://procurelex.ie/glossary/design-contests) is a procedure enabling the contracting authority to acquire, mainly in town and country planning, architecture, engineering or data processing, a plan or design selected by a jury after being put out to competition, with or without prizes ([Regulation 2(1)](https://procurelex.ie/regulations/2#p1)).

### Scope and value

Chapter 2 applies to design contests organised as part of a procedure leading to a public service contract, and to design contests with prizes or payments to participants ([Regulation 78(1)](https://procurelex.ie/regulations/78#p1)). In the first case, the value compared with the threshold is the estimated value of the service contract, including any prizes or payments ([Regulation 78(2)](https://procurelex.ie/regulations/78#p2)). In the second, it is the total of the prizes and payments, including the estimated value of any service contract that may follow by negotiated procedure without prior publication, if the contest notice announces that intention ([Regulation 78(3)](https://procurelex.ie/regulations/78#p3)).

### Notices

The contracting authority announces the contest by a contest notice ([Regulation 79(1)](https://procurelex.ie/regulations/79#p1)), which must state any intention to award a subsequent service contract under Regulation 32(7) and (8) ([Regulation 79(2)](https://procurelex.ie/regulations/79#p2)). After the contest it sends a notice of the results for publication and must be able to prove the date of dispatch ([Regulation 79(3)](https://procurelex.ie/regulations/79#p3)). Information on the outcome may be withheld where publication would impede law enforcement, be contrary to the public interest, prejudice legitimate commercial interests or prejudice fair competition ([Regulation 79(4)](https://procurelex.ie/regulations/79#p4)).

### Organisation and participants

Procedures must be adapted to Part 1 and to Chapter 2 ([Regulation 80(1)](https://procurelex.ie/regulations/80#p1)). Admission may not be limited by reference to the territory of the State or a Member State, or by requiring participants to be natural or legal persons ([Regulation 80(2)](https://procurelex.ie/regulations/80#p2)). If the contest is restricted to a limited number of participants, the selection criteria must be clear and non-discriminatory, and the number invited must be sufficient to ensure genuine competition ([Regulation 80(3)](https://procurelex.ie/regulations/80#p3), [Regulation 80(4)](https://procurelex.ie/regulations/80#p4)).

### The jury

The jury is made up exclusively of natural persons independent of the participants; where a particular professional qualification is required of participants, at least a third of the jury must have it or an equivalent ([Regulation 81](https://procurelex.ie/regulations/81)). The jury is autonomous, examines the plans and projects anonymously and solely on the criteria in the contest notice, and records its ranking in a report signed by its members ([Regulation 82(1)](https://procurelex.ie/regulations/82#p1)). Anonymity is kept until the jury has reached its opinion or decision ([Regulation 82(2)](https://procurelex.ie/regulations/82#p2)). Candidates may be invited to answer questions recorded in the minutes to clarify a project, and minutes are drawn up of that dialogue ([Regulation 82(3)](https://procurelex.ie/regulations/82#p3), [Regulation 82(4)](https://procurelex.ie/regulations/82#p4)).

### The follow-on contract

A service contract that follows a design contest may be awarded by negotiated procedure without prior publication to the winner or one of the winners, under the rules of the contest; where there are several winners, all must be invited to the negotiations ([Regulation 32(7)](https://procurelex.ie/regulations/32#p7), [Regulation 32(8)](https://procurelex.ie/regulations/32#p8)).