# Framework agreements, dynamic purchasing and e-tools

- URL: https://procurelex.ie/guides/framework-agreements-and-dynamic-purchasing
- Updated 2026-11-20
- Reviewed by Mara Ribeiro Duarte (Head of Public Sector at Closer), 2026-11-20
- Legal basis: Regulation 33, Regulation 34, Regulation 35, Regulation 36, Regulation 37, Regulation 38, Regulation 6(8)

How framework agreements are concluded and called off, how a dynamic purchasing system works, when electronic auctions and electronic catalogues may be used, and how central purchasing bodies and joint procurement fit in.

Chapter 2 of Part 2 of the Regulations sets out the techniques and instruments for electronic and aggregated procurement: framework agreements, dynamic purchasing systems, electronic auctions, electronic catalogues, central purchasing bodies and joint procurement. None of them is a procedure of its own: a framework agreement or a dynamic purchasing system is set up through the procedures of the Regulations, and contracts based on it are then awarded under Regulations 33 and 34.

## Framework agreements

A [framework agreement](https://procurelex.ie/glossary/framework-agreement) establishes, between one or more contracting authorities and one or more economic operators, the terms governing contracts to be awarded during a given period, in particular price and, where appropriate, quantities ([Regulation 2(1)](https://procurelex.ie/regulations/2#p1)). A contracting authority may conclude one where the procedures provided for in the Regulations are complied with ([Regulation 33(1)](https://procurelex.ie/regulations/33#p1)).

### Value and duration

The estimated value to be compared with the [thresholds](https://procurelex.ie/thresholds) is the maximum estimated value, net of VAT, of all the contracts envisaged for the total term of the framework agreement ([Regulation 6(8)](https://procurelex.ie/regulations/6#p8)).

The term of a framework agreement shall not exceed 4 years, other than in exceptional cases, duly justified, in particular by the subject of the framework agreement ([Regulation 33(2)](https://procurelex.ie/regulations/33#p2)).

### Who may use it

Contracts based on a framework agreement are awarded under paragraphs (6) to (10) of Regulation 33 ([Regulation 33(3)](https://procurelex.ie/regulations/33#p3)). Those procedures may be applied only between the contracting authorities clearly identified for that purpose in the call for competition or the invitation to confirm interest and the economic operators party to the framework agreement as concluded ([Regulation 33(4)](https://procurelex.ie/regulations/33#p4)).

Contracts based on a framework agreement shall not entail substantial modifications to its terms ([Regulation 33(5)](https://procurelex.ie/regulations/33#p5)).

### Single-operator framework agreements

Where the framework agreement is concluded with one economic operator, contracts based on it are awarded within the limits of its terms ([Regulation 33(6)](https://procurelex.ie/regulations/33#p6)). The contracting authority may consult that operator in writing and ask it to supplement its tender, as necessary ([Regulation 33(7)](https://procurelex.ie/regulations/33#p7)).

### Multi-operator framework agreements

Where there is more than one economic operator, the framework agreement is performed in one of three ways ([Regulation 33(8)](https://procurelex.ie/regulations/33#p8)):

| Way              | When it is available                                                                                                                                                                 | How the contract is awarded                                  |
| ---------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ | ------------------------------------------------------------ |
| Direct award     | The agreement sets out all the terms and the objective conditions for choosing which operator performs; those conditions are indicated in the procurement documents ([Regulation 33(8)(a)](https://procurelex.ie/regulations/33#p8-a)) | On the terms of the agreement, without reopening competition |
| Mixed            | The agreement sets out all the terms, and the procurement documents stipulate that it may be performed this way ([Regulation 33(8)(b)](https://procurelex.ie/regulations/33#p8-b))                                                     | Partly directly, partly by reopening competition             |
| Mini-competition | Not all the terms are laid down in the agreement ([Regulation 33(8)(c)](https://procurelex.ie/regulations/33#p8-c))                                                                                                                    | By reopening competition among the parties                   |

In the mixed model, the choice between reopening competition and buying directly is made on objective criteria specified in the procurement documents for the framework agreement, which also specify which terms may be reopened ([Regulation 33(9)](https://procurelex.ie/regulations/33#p9)). The mixed model may also apply to any lot for which all the terms are specified, whatever the position under other lots ([Regulation 33(10)](https://procurelex.ie/regulations/33#p10)).

### Running a mini-competition

A reopened competition is conducted on the same terms as applied to the award of the framework agreement, more precisely formulated where necessary, and on other terms referred to in the procurement documents where appropriate ([Regulation 33(11)](https://procurelex.ie/regulations/33#p11)). For every contract ([Regulation 33(11)(b)](https://procurelex.ie/regulations/33#p11-b)):

1. the contracting authority consults, in writing, the economic operators capable of performing the contract;
2. it fixes a time limit sufficiently long to allow tenders for that contract to be submitted, taking account of the complexity of the subject matter and the time needed to submit tenders;
3. tenders are submitted in writing and are not opened until that time limit has expired;
4. it awards the contract to the tenderer that submitted the best tender on the award criteria specified in the procurement documents for the framework agreement.

The Regulations set no minimum number of days for a mini-competition.

### Notices, documents and reports

A contract award notice is sent within 30 days of the conclusion of the framework agreement ([Regulation 50(1)](https://procurelex.ie/regulations/50#p1)), but not for each contract based on it ([Regulation 50(4)](https://procurelex.ie/regulations/50#p4)). Up-to-date supporting documents need not be requested before awarding a contract under Regulation 33(7) or (8)(a) ([Regulation 59(9)](https://procurelex.ie/regulations/59#p9)), and no separate written report is required for contracts under paragraphs (6) and (7) or (8)(a) ([Regulation 84(2)](https://procurelex.ie/regulations/84#p2)).

## Dynamic purchasing systems

A [dynamic purchasing system](https://procurelex.ie/glossary/dynamic-purchasing-system) may be used for commonly used purchases whose characteristics, as generally available on the market, meet the contracting authority’s requirements ([Regulation 34(1)](https://procurelex.ie/regulations/34#p1)). Procurement under it follows the rules of the restricted procedure, subject to Regulation 34 ([Regulation 34(2)](https://procurelex.ie/regulations/34#p2)). It must be operated as a completely electronic process and remain open throughout its period of validity to any economic operator that satisfies the selection criteria ([Regulation 34(3)](https://procurelex.ie/regulations/34#p3)).

### Setting it up

The call for competition makes clear that a dynamic purchasing system is involved; the procurement documents state the nature and estimated quantity of the purchases and how the system operates; and the documents remain fully accessible while the system is valid ([Regulation 34(13)](https://procurelex.ie/regulations/34#p13)). The call states the period of validity ([Regulation 34(26)](https://procurelex.ie/regulations/34#p26)), and a change to it is notified to the Commission ([Regulation 34(27)](https://procurelex.ie/regulations/34#p27)). No charges may be billed to interested operators or participants ([Regulation 34(28)](https://procurelex.ie/regulations/34#p28)).

The system may be divided into categories objectively defined by characteristics of the procurement, such as the maximum size of subsequent contracts or a geographic area, with selection criteria for each category ([Regulation 34(4)](https://procurelex.ie/regulations/34#p4), [Regulation 34(5)](https://procurelex.ie/regulations/34#p5), [Regulation 34(8)](https://procurelex.ie/regulations/34#p8)).

### Admission

All candidates satisfying the selection criteria are admitted, and their number may not be limited under Regulation 65 ([Regulation 34(6)](https://procurelex.ie/regulations/34#p6), [Regulation 34(7)](https://procurelex.ie/regulations/34#p7)). Requests to participate may be made throughout the period of validity ([Regulation 34(14)](https://procurelex.ie/regulations/34#p14)).

| Step                                                    | Time                                                                                                                                                                                      |
| ------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Requests to participate in the initial set-up           | at least 30 days from the contract notice or invitation to confirm interest ([Regulation 34(9)(a)](https://procurelex.ie/regulations/34#p9-a))                                                                                              |
| Requests after the first invitation to tender           | no further time limit applies ([Regulation 34(11)](https://procurelex.ie/regulations/34#p11))                                                                                                                                             |
| Assessment of a request                                 | within 10 working days ([Regulation 34(15)](https://procurelex.ie/regulations/34#p15)), extendable to 15 working days in justified individual cases ([Regulation 34(16)](https://procurelex.ie/regulations/34#p16))                                                                       |
| Longer assessment before the first invitation to tender | allowed if stated in the procurement documents and no invitation to tender is issued meanwhile ([Regulation 34(17)](https://procurelex.ie/regulations/34#p17), [Regulation 34(18)](https://procurelex.ie/regulations/34#p18))                                                             |
| Tenders for a specific contract                         | at least 10 days from the invitation to tender ([Regulation 34(9)(b)](https://procurelex.ie/regulations/34#p9-b)); where appropriate, Regulation 28(3) on time limits agreed by sub-central contracting authorities applies ([Regulation 34(10)](https://procurelex.ie/regulations/34#p10)) |

The time limits for assessment are counted in [working days](https://procurelex.ie/glossary/working-day). An operator is told at the earliest possible opportunity whether it has been admitted ([Regulation 34(19)](https://procurelex.ie/regulations/34#p19)).

### Awarding contracts under the system

Every participant admitted to the system, or to the relevant category, is invited to tender for each specific procurement ([Regulation 34(20)](https://procurelex.ie/regulations/34#p20), [Regulation 34(21)](https://procurelex.ie/regulations/34#p21)), and the contract goes to the best tender on the award criteria in the contract notice or invitation to confirm interest, which the invitation to tender may formulate more precisely ([Regulation 34(22)](https://procurelex.ie/regulations/34#p22), [Regulation 34(23)](https://procurelex.ie/regulations/34#p23)). Participants may be asked at any time for a renewed self-declaration within 5 working days ([Regulation 34(24)](https://procurelex.ie/regulations/34#p24)). All communications are electronic ([Regulation 34(12)](https://procurelex.ie/regulations/34#p12)). A contract award notice is sent within 30 days of each contract, or grouped quarterly ([Regulation 50(5)](https://procurelex.ie/regulations/50#p5), [Regulation 50(6)](https://procurelex.ie/regulations/50#p6)).

## Electronic auctions

An electronic auction is a repetitive electronic process, held after a full initial evaluation of the tenders, in which new lower prices, new values for certain elements of the tenders, or both, are presented and ranked by automatic evaluation methods ([Regulation 35(1)](https://procurelex.ie/regulations/35#p1), [Regulation 35(2)](https://procurelex.ie/regulations/35#p2)). Contracts with intellectual performances as their subject matter, such as the design of works, that cannot be ranked automatically are excluded ([Regulation 35(3)](https://procurelex.ie/regulations/35#p3)).

Where the procurement documents, in particular the technical specifications, can be established with precision, an auction may precede the award in an open or restricted procedure or a competitive procedure with negotiation, or be held on reopening competition under a framework agreement or a dynamic purchasing system ([Regulation 35(4)](https://procurelex.ie/regulations/35#p4), [Regulation 35(5)](https://procurelex.ie/regulations/35#p5)). It runs on prices alone where the award is on price only, and otherwise on prices, new values of the features indicated in the procurement documents, or both ([Regulation 35(6)](https://procurelex.ie/regulations/35#p6)).

The auction is announced in the contract notice or invitation to confirm interest, and the procurement documents include the information in [Schedule 4](https://procurelex.ie/regulations/schedule-4) ([Regulation 35(7)](https://procurelex.ie/regulations/35#p7), [Regulation 35(8)](https://procurelex.ie/regulations/35#p8)). All tenderers with admissible tenders are invited simultaneously, with the outcome of the evaluation of their tender and the re-ranking formula, and the auction starts no sooner than 2 working days later ([Regulation 35(14)](https://procurelex.ie/regulations/35#p14), [Regulation 35(16)](https://procurelex.ie/regulations/35#p16), [Regulation 35(17)](https://procurelex.ie/regulations/35#p17)). Tenderers can see their relative ranking throughout, but no identity is disclosed ([Regulation 35(21)](https://procurelex.ie/regulations/35#p21), [Regulation 35(24)](https://procurelex.ie/regulations/35#p24)). The contract is then awarded under Regulation 67 on the results ([Regulation 35(27)](https://procurelex.ie/regulations/35#p27)).

## Electronic catalogues

Where electronic communication is required, a contracting authority may require tenders to be presented as, or to include, an electronic catalogue, and says so in the contract notice or invitation to confirm interest ([Regulation 36(1)](https://procurelex.ie/regulations/36#p1), [Regulation 36(4)](https://procurelex.ie/regulations/36#p4)). A reopened competition under a multi-operator framework agreement may be run on updated catalogues, by resubmission or, if the documents said so, by collecting the information from catalogues already submitted ([Regulation 36(5)](https://procurelex.ie/regulations/36#p5), [Regulation 36(6)](https://procurelex.ie/regulations/36#p6)); the tenderer may then contest or confirm the tender so constituted before award ([Regulation 36(9)](https://procurelex.ie/regulations/36#p9)). Catalogues may also be used in a dynamic purchasing system ([Regulation 36(10)](https://procurelex.ie/regulations/36#p10)).

## Central purchasing bodies and joint procurement

A contracting authority may buy from a [central purchasing body](https://procurelex.ie/glossary/central-purchasing-body), or use its contracts, dynamic purchasing systems or framework agreements, and so fulfils its obligations under the Regulations ([Regulation 37(1)](https://procurelex.ie/regulations/37#p1), [Regulation 37(4)](https://procurelex.ie/regulations/37#p4)). It remains responsible for any part it conducts itself, such as a mini-competition or a contract under the body’s dynamic purchasing system ([Regulation 37(5)](https://procurelex.ie/regulations/37#p5)). The Minister may by written direction require specified classes of procurement to be made through central purchasing bodies ([Regulation 37(3)](https://procurelex.ie/regulations/37#p3)). A contracting authority may award a service contract for centralised purchasing activities to a central purchasing body without applying the procedures of the Regulations ([Regulation 37(7)](https://procurelex.ie/regulations/37#p7)).

Two or more contracting authorities may procure jointly ([Regulation 38(1)](https://procurelex.ie/regulations/38#p1)). Where the whole procedure is run jointly in the name of all, they are responsible together, even if one manages it ([Regulation 38(2)](https://procurelex.ie/regulations/38#p2), [Regulation 38(3)](https://procurelex.ie/regulations/38#p3)); otherwise each is responsible for the parts it conducts alone ([Regulation 38(4)](https://procurelex.ie/regulations/38#p4)). Joint procurement with authorities of other Member States is governed by [Regulation 39](https://procurelex.ie/regulations/39).

For electronic communication in general, see the [FAQ on electronic procurement](https://procurelex.ie/faq/electronic-procurement).